Work room set up in 2023.
© M.SA
We had been planning to build a workroom since 2023, but had stopped at the rafters on the roof. However, we were working on it while working, and progress was slow due to the rainy season, the heat of summer, and the cold of winter. From 2024, we set a goal of significantly reducing our work hours and completing the project. On January 27, 2025, the windows were installed, the entrance door was installed, and the flooring was laid. The area is 2m x 2m. (Photo above)
The work room was expanded and installed. In 2011, the roof and the double-glazed window on the right were installed (photo below).
In 2012, glass doors were installed, and in January 2013, the interior flooring was completed.


The beams and subfloor boards were installed in January 2013 (photo above).
The subfloor panels were installed in January 2013 (photo below).

Installation of floor board


Entrance floor (top photo)

Entrance door.

There is space under the entrance door to store your shoes.