
The Skytree sheet metal model will be gold plated.
Two units have been disassembled.
Remove all electrical components for plating.
This is the shape before disassembly.

Pull out the top gain tower section.

Remove the top disc.

Remove the top mesh plate.

It will come off soon.
The plate has five 1 mm slits.
It's passing through.

Remove the second disc.
Insert the tip of the screwdriver
Release the stopper.

The stopper is released and the disc is lifted.
The yellow LED of the second observation deck can be seen below.

The disk has been removed.

Remove the LED window frame from the second observation deck.
Like the mesh plate, it passes through five 1mm slits. Two stopper claws are locked at each point.
Release it with a screwdriver.

It will come off soon.

Remove the LED from the second observation deck.

Remove the third disk. Use a screwdriver to remove the stopper.
to release it.
RGB continuously variable LED for gain tower lighting in the center
I can see it.

next
The Sky Corridor at the second observation deck has been removed.

Next up is removing the largest disc from the First Observation Deck.
Release the stoppers. There are 12 in total.

It has been removed.
You can see the LED for the first observation deck inside.

LED for the first observation deck.

The LED for the first observation deck has been removed.

This is the base plate.

Inside the pedestal.

Remove the Skytree body from the base.
Release the stopper.

Pull out the central pillar LED.

These are the marks left behind after it was removed.

This is the shape after removing the electrical components.